Etihad Engineering logo
Supplier
Etihad Engineering

Boeing 787 Cabin Reconfiguration + IFE / Connectivity Retrofit

Full 787 cabin reconfiguration with in-house STC engineering.

End-to-end cabin reconfiguration for Boeing 787-9 including monument relocation, seat removal/install, galley and lavatory moves, IFE head-end and seat-end refit and connectivity (Ka/Ku) antenna installation. Etihad Engineering holds a Part-21/J design organisation approval that lets it issue STCs in-house, shortening timelines versus outsourcing to the OEM.

Boeing 787 Cabin Reconfiguration + IFE / Connectivity Retrofit
Technical specifications

Key specs

Aircraft typeBoeing 787-9 / 787-10
Typical turnaround35 – 60 days
STC issuanceIn-house (EASA Part-21/J)
ConnectivityKa / Ku antenna provisions
IFESeat-end and head-end retrofit capable
Installed in GCC

Proven at these airports